Skip to content
Product

Plan the job with the materials in view.

A date on the calendar does not mean a job is ready. Go Time’s inventory and materials workflows help teams review stock by location and upcoming job requirements before promising work the crew cannot finish.

Job workspace in Go Time
Job workspace · Product view styled in light mode. Available views depend on role and setup.
01 / The context

The right quantity in the wrong location still causes a delay.

An office can see stock on hand while a crew’s van is missing the needed part. Keep location records and job requirements useful enough to support dispatch. Special-order items need their own follow-up so they do not disappear behind the overall job status.

02 / The workflow

What this looks like in practice.

  1. Keep items identifiable

    Use consistent SKUs and item names across inventory and job line items. The allocation workflow matches job requirements to inventory items, so clean identifiers matter. Review ambiguous items instead of assuming similar names mean interchangeable parts.

  2. Review the upcoming work

    Look at the materials required by scheduled jobs and the stock available at the relevant locations. Use that information to decide what needs counting, moving, ordering, or confirming with the supplier before the installation date.

  3. Keep the record current

    Update counts and transfers as material moves through the workflow. Review exceptions after the day’s jobs, including unused stock and changed scope. A useful inventory view depends on people recording what actually happened.

03 / A closer look

Make material readiness a scheduling question.

Give dispatch a clear rule for when a job is ready to receive a firm date. A signed contract, deposit, and material check answer different questions. Reviewing them together helps the office communicate a realistic plan while keeping purchasing and field preparation connected.

Keep the handoff clear

  • Inventory by location
  • Upcoming job allocation context
  • Special-order and material readiness review
04 / Questions worth asking

Before you get started.

Does allocation depend on job line items?

Yes. Upcoming allocation uses identifiers such as SKUs and related item mappings, with name matching where needed. Consistent job items make the review more reliable.

Does a recorded quantity guarantee stock is physically there?

No. Inventory is only as current as its counts and movements. Use regular checks and resolve discrepancies before relying on a critical item for tomorrow’s job.

Your business, your workflow

Bring a real job. We’ll walk it through.

See the office side, the field side, and the handoffs in between. Ask the questions that matter to your team.